Project Management
Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing

Nima Moradi; Shahram Shadrokh

Volume 6, Issue 1 , April 2019, , Pages 1-15

https://doi.org/10.22105/jarie.2019.170649.1079

Abstract
  One of the classes of the project schedule is the Material Procurement Scheduling (MPS) problem, which is considered besides the material allocation to warehouse (MAW) problem recently. In the literature, the Simultaneous Solution of MPS-MAW is investigated by considering one warehouse and unlimited ...  Read More

Performance evaluation and benchmarking
A Model for performance evaluation of digital game industry using integrated AHP and BSC

Nima Moradi; Hossein Malekmohammad; Saeed Jamalzadeh

Volume 5, Issue 2 , September 2018, , Pages 97-109

https://doi.org/10.22105/jarie.2018.130777.1037

Abstract
  Nowadays, due to continuous changes in the environment of organizations, the performance evaluation of productive or non-productive companies is not as simple as the past. In spite of the high sale and income of existing companies in the game industry, there are always unsuccessful game products and ...  Read More