Scheduling
A BI-OBJECTIVE OPTIMAL TASK SCHEDULING MODEL FOR TWO-MACHINE ROBOTIC-CELL SUBJECT TO PROBABLE MACHINE FAILURES

Bahareh Vaisi; Hiwa Farughi; Sadigh Raissi; Heibatolah Sadeghi

Articles in Press, Accepted Manuscript, Available Online from 25 September 2022

https://doi.org/10.22105/jarie.2022.336768.1465

Abstract
  In this study, we model a stochastic scheduling problem for a robotic cell with two unreliable machines susceptible to breakdowns and subject to the probability of machine failure and machine repair. A single gripper robot facilitates the loading/unloading of parts and cell-internal movement. Since it ...  Read More