Project Management
Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing

Nima Moradi; Shahram Shadrokh

Volume 6, Issue 1 , April 2019, , Pages 1-15

https://doi.org/10.22105/jarie.2019.170649.1079

Abstract
  One of the classes of the project schedule is the Material Procurement Scheduling (MPS) problem, which is considered besides the material allocation to warehouse (MAW) problem recently. In the literature, the Simultaneous Solution of MPS-MAW is investigated by considering one warehouse and unlimited ...  Read More