[1] Tompkins, J. A., White, J. A., Bozer, Y. A., & Tanchoco, J. M. A. (2010). Facilities planning. John Wiley & Sons.
[2] Lawrence, S. R., & Buss, A. H. (1994). Shifting production bottlenecks: causes, cures, and conundrums. Production and operations management, 3(1), 21-37.
[3] Kuo, C. T., Lim, J. T., & Meerkov, S. M. (1996). Bottlenecks in serial production lines: a system-theoretic approach. Mathematical problems in engineering, 2(3), 233-276.
[4] Chiang, S. Y., Kuo, C. T., & Meerkov, S. M. (1998). Bottlenecks in Markovian production lines: a systems approach. IEEE transactions on robotics and automation, 14(2), 352-359.
[5] Law, A. M. (1983). Statistical analysis of simulation output data. Operations research, 31(6), 983-1029.
[6] Roser, C., & Nakano, M. (2015). A quantitative comparison of bottleneck detection methods in manufacturing systems with particular consideration for shifting bottlenecks. IFIP international conference on advances in production management systems (pp. 273-281). Springer, Cham.
[7] Bernedixen, J., Pehrsson, L., Ng, A. H., & Antonsson, T. (2015). Simulation-based multi-objective bottleneck improvement: towards an automated toolset for industry. 2015 winter simulation conference (WSC) (pp. 2183-2194). IEEE.
[8] Boysen, N., Fliedner, M., & Scholl, A. (2007). A classification of assembly line balancing problems. European journal of operational research, 183(2), 674-693.
[9] Narayanasamy, P. (2010).
Identification and mitigation of bottlenecks in complex production system (Doctoral dissertation, Wichita State University). Retrieved from
https://soar.wichita.edu/handle/10057/3735
[10]Chiadamrong, N., & Limpasontipong, P. (2003). Using storage buffer to improve unbalanced asynchronous production flow line's performance. International journal of manufacturing technology and management, 5(1-2), 149-161.
[11]Tamilselvan, P., Krishnan, K., & Cheraghi, H. (2010). Measurement of shifting bottlenecks in a non-buffer production system. Proceedings of the 2010 industrial engineering research conference. Institute of Industrial and Systems Engineers (IISE).
[12]Papadopoulos, C. T., O'Kelly, M. E., Vidalis, M. J., & Spinellis, D. (2009). Analysis and design of discrete part production lines (p. 279). New York: Springer.
[13]Altuger, G., & Chassapis, C. (2009). Multi criteria preventive maintenance scheduling through arena based simulation modeling. Winter simulation conference (pp. 2123-2134). Austin, Texas: Winter Simulation Conference.
[14]Heshmat, M., El-Sharief, M. A., & El-Sebaie, M. G. (2013). Simulation Modeling of Automatic Production Lines with Intermediate Buffers. International journal of scientific & engineering research, 4(7), 2528-2535.
[15]Gopalakrishnan, M., Skoogh, A., & Laroque, C. (2016, December). Buffer utilization based scheduling of maintenance activities by a shifting priority approach-a simulation study. 2016 winter simulation conference (WSC) (pp. 2797-2808). IEEE.